Marc's home
My documentation
Presentations
NCAS
Job highlights (31 July 2020)
UKESM-GA: Hybrid model (17 June 2020)
RMetSoc conf (July 2019)
CMS retreat (Dec 2018)
UKESM-LTSM: UKESM1-hybrid (July 2018)
Cost of chemistry
Hybrid model
When we couple
Chemistry and aerosol feedbacks
Road to hybrid model
Hybrid performance
UKESM-fast
Fields after 10 days
Evaluation
Future of Hybrid model
Extra: the drift of Jnr from Snr
UKESM: 3 November 2017
UKESM-hybrid: 1 December 2015
2 UMs: 24 April 2015
Chemistry and aerosol feedbacks
The science only done by Jnr is shown in magenta
The science done by Snr is shown in green
The coupling from Jnr->Snr is shown as red arrows
The coupling of H20 feedback (passing of Δq) is not done yet