Oscar Martínez-Alvarado
NAWDEX-UK Forecast Products Log
Return to the NAWDEX-UK Forecast Products website or directly to the plots.
22-08-2016
- Several plots are missing from forecasts between 12Z 20 August 2016 to 0Z 22 August 2016
- Most plots have been recovered, but some are still missing. There are no plans to recover them, but this can be done upon request
19-08-2016
- Error in control-member GHGS plots has been corrected. Plots for 6Z and 12Z 18 August 2016 are missing, but the rest have been re-made and uploaded
- Divergence and relative vorticity have been implemented
18-08-2016
- 320-K 2-PVU contour in ensemble member with maximum RMS error with respect to control member has been added to the 320-K troposphere probability plots
- Control-member GHGS plots are not loading since the 6Z 18 Aug 2016 forecast due to an error
12-08-2016
- Lat-lon grid line spacing changed from 30 degrees to 10 degrees in both directions in 320-K PV plots
- Resolution of plots changed from 100 dpi to 120 dpi
- There was an error loading the 12-08-2016 0600 UTC forecast. The scripts are being re-run to retrieve those plots
- The problem has been corrected and the plots are available
- The probability of being in tropospheric air at 320 K has been implemented