Oscar Martínez-Alvarado

NAWDEX-UK Forecast Products Log

Return to the NAWDEX-UK Forecast Products website or directly to the plots.

22-08-2016

  • Several plots are missing from forecasts between 12Z 20 August 2016 to 0Z 22 August 2016
  • Most plots have been recovered, but some are still missing. There are no plans to recover them, but this can be done upon request

19-08-2016

  • Error in control-member GHGS plots has been corrected. Plots for 6Z and 12Z 18 August 2016 are missing, but the rest have been re-made and uploaded
  • Divergence and relative vorticity have been implemented

18-08-2016

  • 320-K 2-PVU contour in ensemble member with maximum RMS error with respect to control member has been added to the 320-K troposphere probability plots
  • Control-member GHGS plots are not loading since the 6Z 18 Aug 2016 forecast due to an error

12-08-2016

  • Lat-lon grid line spacing changed from 30 degrees to 10 degrees in both directions in 320-K PV plots
  • Resolution of plots changed from 100 dpi to 120 dpi
  • There was an error loading the 12-08-2016 0600 UTC forecast. The scripts are being re-run to retrieve those plots
  • The problem has been corrected and the plots are available
  • The probability of being in tropospheric air at 320 K has been implemented

Page navigation