For a Snr with 16x16 MPI tasks for 5 days. Jnr has 32x16 MPI tasks. %s compared to ATMOS only (ran in 1,209s).
Components | % extra |
---|---|
What can be removed from Snr | |
Chemistry scheme/UKCA_MAIN1 (+4,878s*) | +400% |
Advection of UKCA fields/EG_CORRECT_TRACERS_UKCA (+238s*) | +31% |
SL transport of UKCA fields/SL_TRACER1_4A & TR_SET_PHYS_4A (+256s) | +21% |
Convective transport of UKCA fields/NI_CONV_CTL (+171s) | +14% |
Meaning of UKCA fields for diagnostics (+60s) | +5% |
What is difficult to remove from Snr (done through D1 and blind to section) | |
Scatter and gather of UKCA fields (+45s) | +4% |
What can't be removed from Snr | |
RADAER/UKCA_RADAER_BAND_AVERAGE (+190s) | +16% |
Receive/wait for coupling fields/OASIS3_GET_SNR (+140s) | +12% |
Final Snr was 26% slower than CLASSIC (1,532s)